After the steel pipe is welded, there will be a zinc supplementation process at the welding part that ensures the integrity of the zinc coating inside the steel pipe.
We have special passivation treatment on the surface of the product, in passivation process, we have own invention patents-galvanized pipe passivation liquid automatic spraying system that ensures even adhesion, high passivation efficiency, beautiful apprearance.
When the steel pipe is cut, we also have to deal with the rough edges. Look at the end, it is very smoothly and neatly. All product details can reflect our strict requirements for product quality.
Pre-galvanized steel pipe is more cheaper than the hot dip galvanized steel pipe and also have nice anti-rust. If you don't have a high requirement for steel pipes, then we suggest you to choose the pre galvanized steel pipe.
| Products | Pre-galvanized round steel pipe | |
| Specification | OD | 15-165mm |
| WT | 0.8-2.5mm | |
| Length | 1-24m | |
| Zinc coat | 40-240g/m² | |
| Steel grades | Q195, Q235A-B, Q345A-E, ASTM A36, ASTM A500, ASTM A53, ASTM 106, SS400, St37, St52, S235JR, S355TRH etc | |
| Standards | GB/T 3091-2001, GB/T13912-2002, BS 1387, ASTM F1083 etc. | |
| Pipe ends treatment | plain, beveled, threaded, socket with holes, with PVC clap/ coupling/ clamp, or as customers’ requirement | |
| Application | liquid delivery (pump well, gas, water), construction pipe, structural pipe(greenhouse structure, fence post), curtain wall, machinery part etc. | |
| Package | in bundle, no other package or wrapped with waterproof, or as customers’ requirement | |
| Delivery Time | 10days from stock; 20-30days produced according to the qty | |
| Payment Term | T/T or L/C | |
| Price Term | CIF; CFR; FOB Tianjin, China; EXW | |
| Loading Port | Tianjin, China | |
| MOQ | One container | |
| Others | 1. All the pipes is high-frequency welded. | |
| 2. Both inner and outer welded stab can be removed. | ||
| 3. Special design available according to requirement. | ||
| 4. Pipe can be necked down and punched holes. | ||
| 5. Supplying BV or SGS Inspection if client need. | ||
5 ton of each size
USD 500 ~ 650 / TON
30% deposit in advance, balance against copy of B/L; or 100% L/C, etc.
10,000 TONS / MONTH
10 ~ 15 days after received your deposit
In bundles with steel strip, water proof plastic packing or in bulk